Thursday, January 19, 2012

More progress but is it enough for a 1/27 move in? today is 1/19. that's 8 days til trucks roll up.
here is what the house looks like Tuesday AM and then this morning (Thursday).

Kitchen before counter tops. (this was Tuesday)

Fiddling with the fridge (also Tuesday)


My kitchen pantry!

with wine rack--guess I've got to start working on my tolerance again...

the counter top and the faucets are in--master bathroom

Bath tub, where are you?

PHOTOS FROM TODAY THURSDAY start here:

The Bathtub has arrived and brings with it many problems. apparently it is facing the wrong way. I had wanted to face the windows.  Carib suggests looking into the bathroom--a bit too late as it is not possible to move and I'm very happy with looking out the window. but WAIT, there's more. there is not enough of a ledge on the long sides of the bathroom. Ach! we decided to just build out a bit on one side and push the other side flush against the wall.  On the happy news front, I was told I can put the GLASS wall on the ledge of the tub giving us about 4 more inches of elbow room in the shower and a ledge to put more stuff on. yeaey!! details to be confirmed later and it could all still go wrong so not going to be too excited just yet.
 


Now the pulls and handles are in.

The ceiling of the master re painted to be pale pale blue and white trim.

under the thick layer of dust is Daniel and Seth's bathroom sinks. faucets and pulls all installed. mirror ordered, light fixtures just need to arrive.



Bathtub, toilet, tile, completed for boys bathroom bath and now the window has to be water proofed!! 

my lovely washing machines hiding in Seth's room

Hall guest bath. I'm ever so proud of this bathroom, the tile, shower head the whole thing. I think it came out so lovely and tiles were not expensive.

Hall bathroom vanity and faucet. counter top also installed.


I was trying to show that the old nub from the old railing has been sawed off.

Powder room pedestal sink has been moved over to as centered as it can be--that stud is in the way but i think its pretty much in the middle.

my lovely kitchen. its so lovely. I can't wait to get some stools and just sit there and stare at the loveliness.


Hand rails go here between house and post.

but do we want them here?

another view.

The basement sink, counter, pulls all installed. Here we are getting a medicine cabinet and a mirror. and we randomly had to make a shelf behind the toilet because of a jut out that we was concealed and benefited by getting a bit more counter space. i like it.

current mud room. still needs the ever important hooks and cubbies.

basement kitchnette--sink and counter top to come next week