The concrete walls are in

June 16, 2011
The back has been totally dug out, the concrete walls are in, and the lumber arrived today.
Here are pix of the work in progress.
(also, as of tonight at 7:30p all boxes with packing paper have been taken to the loading doc by me and the boys and the apartment is officially empty of packing paper!!!)


The guys carry these heavy metal plates where the concrete wall is supposed to go.

They make these 12 inch wide parallel gaps.

Here come the cement trucks (there were two)
after pouring in the concrete in the gaps, the concrete hardens and then, walls! with brick patterns.
 

Then the guys have to climb out of this humongo hole and carry out the metal plates they used.